Steps to building a R11.2 Test System

From SDU
Jump to: navigation, search
To make corrections or additions to this article, select the edit tab above.
To discuss or ask questions about this article, select the discussion tab above.

Overview

The following are the steps I have used to build several test systems.

It involves getting a sql backup of mdb, with all login's in the backup and then restoring is to a test system that has been setup and have an existing mdb built. The existing mdb is copied over using the SQL restore.

Steps to go from migrated R11.x system to a R11 test system

Procedures

  1. install the base product
  2. run the pdm_configure to setup and ensure the environment is correct.
  3. backup $NX_Root/site/mods on the production system
  4. do the following extract on production
    • pdm_extract wspcol > wspcol.txt
    • pdm_extract wsptbl > wsptbl.txt
  5. restore the wspcol / wsptab to the test system
    • pdm_load -f wspcol.txt
    • pdm_load -f wsptbl.txt
  6. delete the file $NX_Root/site/mods/wsp_schema.log (may not be present)
  7. log on to the Web Screen Painter
    1. open the Schema Designer
    2. open any table and make a dummy update (e.g. the description some place)
    3. choose 'File' -> 'Save and Publish'
    4. shutdown the Unicenter Service Desk services
    5. run pdm_publish
    6. start the Unicenter Service Desk services
    7. check for any errors
    8. sign on to Service Desk
    9. sign on to sql visual studio
      • verify that any schema changes are in place
    10. check the ddict.sch found in $nxroot\site verify fields are in the ddict
  8. copy $NX_Root/site/mods to the test system (see step 3)
  9. run the pdm_configure to setup and ensure the environment is correct.
    • check ddict.sch found in $NX_Root/site, to make sure that the fields were added correctly
  10. restore the database using SQL
  11. change the database name in the following table
    • dlgtsrv table
      1. change the primary server name to the test server name
        • sym from production name to test name
        • server from production name to test name
  12. change all the notifications in the usp_contact record to 'Notification'
    • c_cm_id1, c_cm_id2, c_cm_id3, c_cm_id4
    • SQL Command is update dbo.usp_contact SET c_cm_idx = 1801
  13. reboot the server
  14. before running pdm_configure, check the following
    • User ServiceDesk is active and available
    • Update ServiceDesk in the SQL database
  15. apply patches

See Also

Migrating Schema Changes Between Systems